GALILEO
Return to main
Galileo Table of Contents Page.
The Galileo Energetic Particles Detector
Galileo EPD Handbook
Chapter 2. EPD Software
EPD SBAND Mission Software Requirements (continued)
Source: S. Jaskulek, various dates
Appendix D. EPD Telemetry Mode Definition Blocks
The Telemetry Mode Definition Block listing shown below represent the EPD S-Band software release version 1, delivered to the project in January 1995.
Table D-1. Record Mode - Telemetry Mode Definition Block. Version 2.
Address (hex) | Data (hex) |
1800 | { C0 04 7F C0 05 6E C0 06 0D C0 06 35 C0 06 73 C0 } |
1810 | { 06 B2 C0 07 03 C0 07 7C C0 08 00 00 1A 8F C0 10 } |
1820 | { A7 C0 18 80 C0 18 80 0D 1C 1D OE 1E 1F 4A 4B 47 } |
1830 | { 4E 45 55 4F 44 5F 5E 0F 53 48 58 49 41 5B 4C 5C } |
1840 | { 57 54 46 56 5A 07 14 15 05 04 16 06 17 52 43 4D } |
1850 | { 5D 40 51 50 42 03 13 0B 1B 1A 11 02 12 01 19 09 } |
1860 | { 0A 18 08 00 10 C1 01 } |
Table D-2. RT Map1 - Telmetry Mode Definition Block. Version 2.
Address (hex) | Data (hex) |
1800 | { C0 18 89 C0 05 6E C0 06 0D C0 06 35 C0 06 73 C0 } |
1810 | { 1B 5A C0 07 03 C0 07 7C C0 08 00 C0 1A 8F C0 10 } |
1820 | { A7 C0 18 80 C0 18 80 10 01 08 0B 52 51 4B 4A 43 } |
1830 | { 4F 00 11 02 12 03 13 04 18 19 09 0A 1A 0C 50 55 } |
1840 | { 4D 48 45 42 41 53 4E 1B 14 15 05 16 06 17 07 0D } |
1850 | { 1C 1D 0E 1E 0F 1F 40 C1 00 00 00 00 00 00 00 00 } |
1860 | { 00 00 00 00 00 00 02 |
Table D-3. RT Map2 - Telemetry Mode Definition Block. Version 2.
Address (hex) | Data (hex) |
1800 | { C0 18 89 C0 05 6E C0 06 0D C0 06 35 C0 06 73 C0 } |
1810 | { 1B 5A C0 07 03 C0 07 7C C0 08 00 C0 1A 8F C0 10 } |
1820 | { A7 C0 18 80 C0 18 80 10 01 11 02 12 08 0B 52 51 } |
1830 | { 55 4B 4A 48 43 42 4F 00 03 13 04 18 19 09 OA 1A } |
1840 | { 1B 14 15 05 0D OE 0F 50 4D 45 40 41 53 4E 16 06 } |
1850 | { 17 07 0C 1C 1D 1E 1F C1 01 00 00 00 00 00 00 00 } |
1860 | { 00 00 00 00 00 00 02 } |
Next: LGA Processor Status Memo
Return to Galileo EPD Handbook Table of Contents Page.
Return to main
Galileo Table of Contents Page.
Return to Fundamental
Technologies Home Page.
Updated 8/23/19, Cameron Crane
QUICK FACTS
Manufacturer: The Galileo Spacecraft
was manufactured by the Jet Propulsion Laboratory,
Messerschmitt-Bölkow-Blohm, General Electric, and the
Hughes Aircraft Company.
Mission Duration: Galileo was planned to have a mission duration of around 8 years, but was kept in operation for 13 years, 11 months, and 3 days, until it was destroyed in a controlled impact with Jupiter on September 21, 2003.
Destination: Galileo's destination was Jupiter and its moons, which it orbitted for 7 years, 9 months, and 13 days.
Mission Duration: Galileo was planned to have a mission duration of around 8 years, but was kept in operation for 13 years, 11 months, and 3 days, until it was destroyed in a controlled impact with Jupiter on September 21, 2003.
Destination: Galileo's destination was Jupiter and its moons, which it orbitted for 7 years, 9 months, and 13 days.